EE394J_2, Power System Engineering II, Spring 2012


_01_EE394J_2_Spring12_Course_Desc.pdf
_01_EE394J_2_Spring12_Power_Presentation.ppt
_01_EE394J_2_Spring12_Power_Refresher_Problems.pdf
_01_EE394J_2_Spring12_Texas_Synchrophasor_Events.pdf
and the program
PMU_Waveform_Analyzer.exe
and the nine hourly files for the ten events
120103,010000000,UT,Austin,3378,Phasor.zip
120103,130000000,UT,Austin,3378,Phasor.zip
120103,180000000,UT,Austin,3378,Phasor.zip
120107,080000000,UT,Austin,3378,Phasor.zip
120109,090000000,UT,Austin,3378,Phasor.zip
120110,130000000,UT,Austin,3378,Phasor.zip
120111,000000000,UT,Austin,3378,Phasor.zip
120112,030000000,UT,Austin,3378,Phasor.zip
120112,220000000,UT,Austin,3378,Phasor.zip

_03_EE394J_2_Spring12_Transmission_Lines.pdf
_04_EE394J_2_Spring12_Transmission_Lines_cont.pdf
_04_EE394J_2_Spring12_Transmission_Lines_cont.pdf
_05_ERCOT_MAP.ppt
_05_EE394J_2_Spring12_Per_Unit_System.pdf
_05_EE394J_2_Spring12_Symmetrical_Components.pdf
_05_EE394J_2_Spring12_Power_System_Matrices.pdf
_06_EE394J_2_Spring12_Short_Circuits.pdf
_06_EE394J_2_Spring12_Notes_120302.pdf
_07_EE394J_2_Spring12_Short_Circuits_Solutions.pdf
_07_EE394J_2_Spring12_Short_Circuits_Solutions.pdf
_08_EE394J_2_Spring12_Loadflow.pdf
_08_Understanding Power System Harmonics (includes user guides for PCFLO and HAPS), pdf
_08_PCFLO Executable and Files (zipped)
_08_HAPS Executable and Files (zipped)
_08_EE394J_2_Spring12_Screwbean_Wind_Farm_Study.pdf
_09_EE394J_2_Spring12_Model_1_Stability_Model_for_Synchronous_Machines.pdf
_10_EE394J_2_Spring12_Inertia_Calculation.pdf
_10_EE394J_2_Spring12_Stability_Clearing_Time.pdf
_11_EE394J_2_Spring12_Stability_Model_1_Solver.xls
_11_EE394J_2_Spring12_Weeks_Book_Excerpts.pdf
_12_EE394J_2_Spring12_Lightning_Step Potential_Shock Energy_Problem.pdf
_13_Go to my solar page and use the Solar_Data_Analyzer spreadsheet to view and comment on Saturday, April 7 (Day of year = 098)
_14_TOWERABC_120430.zip

Homework
-------------------
HW#1, for Monday, Jan. 23,
Use PMU_Waveform_Analyzer.exe to view each of the four graphs of Texas Synchrophasor Event #7, copying and pasting the screen graphs into a Word doc. Do not try to match the scaling shown in the Texas Synchrophasor Event document because those scales and graphs were done with Excel. Print your doc in black & white.
Also, work out Problems 1,2,3,4 of the Power Refresher Problems.

HW#2, for Monday, Jan. 30,
Problems 5,6,7,8 of the Power Refresher Problems.
Also, the two problems on slides 41 and 42 of _01_EE394J_2_Spring12_Power_Presentation.ppt.

HW#3, for Wednesday, Feb. 8, _03_EE394J_2_Spring12_HW3.pdf

HW#4, for Wednesday, Feb. 22, Transmission line model problem on the last page of _03_EE394J_2_Spring12_Transmission_Lines.pdf

HW#5, for Wednesday, Feb. 29
Prob. 1. Work Prob. 9 from the refresher problems
Prob. 2. Draw the pos/neg sequence one-line diagram in per unit for the problem on page 3 of Per_Unit_System.pdf
Prob. 3. Build the pos/neg sequence admittance matrix for Prob. 2
Prob. 4. Repeat Problems 2 and 3 for zero-sequence

HW#6, for Wednesday, Mar. 6
Draw the positive/negative/zero sequence diagrams for the "Stevenson" circuits on pages 18 and 19 of _06_EE394J_2_Spring12_Short_Circuits.pdf

HW#7, for Friday, Mar. 23
Perform a loadflow analysis to determine the feasibility of a new 100 MW Roy Orbison Wind Farm at WINK_ORB 138kV bus, and shipping the power to Harris 69kV next to the U.T. Austin Law School. Follow the Screwbean procedure, but use WINK_ORB instead of Screwbean. One or two page writeup.

HW#8, for Monday, April 16
Work the lightning problem _12_ linked above

HW#9, for Friday, May 4
Apply the Markt-Mengele method for the 500kV single-circuit tower, using TOWERABC
-------------------